Definition of done — what is still open

The live checklist. PLAN.md holds the reasoning and the record; this file holds only what is not yet ticked, so a session can pick up the work without loading 3 000 lines. Keep it short: when an item closes, tick it here, write the result into PLAN.md, and delete the detail from this file.

The standing schema gate — never ticked, checked at every bump

An update must migrate an existing install without losing anything. This one does not close with a phase. Whenever BUNNY_SCHEMA_VERSION changes, all five hold before the release goes out:

  1. MIGRATION_x_y written and registered in BUNNY_MIGRATIONS for every step. A migration Room never runs is not a migration.
  2. The exported app/schemas/*/N.json committed and git-tagged (ADR-0007) — every later migration is written from it.
  3. SchemaGateTest asserting appSchemaVersion = N, so the launch gate is proven to let the upgrade through. Every migration test opens the database directly and walks past that gate; this is the only thing standing in front of it (ADR-0023’s Phase 7.5 amendment).
  4. A migration test proving the rows survive — the committed backup fixtures, restored and counted by value, at API 26/34/36.
  5. An actual upgrade watched on the phone: seed the previous tag, install the new build over it, confirm the app opens, user_version climbed, and a table-by-table diff on common columns is empty. A release-shaped debug build is how to do this without touching the Play install (phase-7.5.md §7) — build it with ./gradlew assembleDebug -PreleaseShapedDebug, which is minified and BuildConfig.DEBUG == false. ⚠️ Both halves are load-bearing: migrations are registered only when destructiveMigrationAllowed() says no, so a merely-minified debug build meets the older database with the wipe-consent screen and migrates nothing — a proof of the wrong code path, and one that looks at a glance like the refusal screen 1.5 nearly shipped. It is not debuggable, so read the result by installing a plain assembleDebug over the top afterwards; an install never touches the data directory. And teach upgrade-diff.py any column the migration moves before trusting it — a moved column is invisible to its generic diff by definition.

scripts/schema-gate.py enforces 1–3 in CI on every pull request. 4 and 5 are judgement, and 5 is the one that caught the refusal screen 1.5 would otherwise have shipped to every existing owner.

⚠️ It fired at Phase 10, and it is discharged. Phase 10 takes the schema to 8 — §4 and §5 share one MIGRATION_7_8 — and rule 5 carried an extra clause, that the upgrade be watched on a minified build, because §3 turns R8 on in the same release. ✅ Done 2026-08-25: a real schema-7 fixture seeded through the schema-7 tag’s own build, the release-shaped build installed over it, the app opened with no refusal, user_version 7 → 8, and upgrade-diff.py reporting nothing lost across all 20 tables with both tray photo paths landed in observation_photos. The record is phase-10.md §4.



Where the project stands

Every phase is closed. Phase 10 was the last one, ticked 2026-08-26; its record is phase-10.md, and the box-by-box checklist this file used to hold is that file’s appendix. There is no Phase 11 written, and there is not meant to be — the plan ran out on purpose. What comes next is whatever owners report, the way Phase 10’s own contents arrived.

So this file is back to what its title says: the standing schema gate above, which never ticks, and the short list below of things that are open without being a phase.


Open, and not a phase

  • 1.9.0 has not shipped. Phase 10 closes on the build being done and proven — every box ticked, the schema-8 upgrade watched on a minified build, R8 on. The release is the act after it: merge to main, merge release-please’s PR, and the tag’s GitHub Release fires publish-play.yml onto the internal track. Production is a second, manual, environment-gated run.
  • ⚠️ Three CI workflows have never run, and none of them can until this merges — GitHub reads release, schedule and workflow_dispatch triggers from the default branch only. That is publish-play.yml, publish-play-production.yml, and ci.yml’s nightly edge-to-edge matrix, which was written against emulators no one here has (no local KVM). Read the first run of each before believing any of them works; a workflow that has never run is a draft with good syntax.
  • The listing follow-up, deliberately its own PR. Folded into the Phase 10 PR and done 2026-08-26: nine locales × eight scenes, light, in art/play-screenshots/, with store-listing.md and art/README.md rewritten around them. The shots are cropped above the status bar — the capture driver’s Do Not Disturb puts a crossed bell in every frame and this ROM ignores SystemUI demo mode, so pad-screenshot.py --crop-status-bar is the only place it comes off. What is left of this box is the Console: the production job with dry_run: true, update_listing: true as its first real exercise, before a real one — and nine locales is nine uploads, not one.
  • Play’s per-app contact email still names the Gmail inbox. Change it in Store settings to binky.support@maksforge.com the day the address change merges, not at the upload: maksforge.com republishes privacy-policy.md and index.md within about 15 minutes of a merge to main, and the policy’s Contact section defers to the listing, so the two disagree from that moment (see store-listing.md).
  • The maksforge route has not carried a real report yet. Only Gmail’s send-as confirmations have come through Cloudflare. Send Report a bug from the app off a non-Gmail account and confirm it lands in the inbox, not Spam, with the subject:bug OR subject:feature OR subject:language filter applying on the account it now reaches — Phase 6’s first report went to Spam with no error at either end (phase-6.md), and translation reports carry #language, which the older two-term filter misses.
  • Google’s developer-verification registration is due 30 Sept 2026. The owner believes the app is already registered and has not confirmed it in the Console; confirming is the whole task. The other deadline Play surfaced — the target-API requirement on 31 Aug 2026 — is already satisfied, because targetSdk is 36.
  • The tip has no products yet (ADR-0011’s Play Billing amendment). Play Console refuses to create in-app products until a build carrying the billing library is on a track, so the order is fixed: upload the release with the tip to internal, then Monetize with Play → Products → One-time products → tip_small, tip_medium, tip_large, tip_xlarge at 5 / 10 / 20 / 50 PLN, consumable, with multi-quantity switched on, and activate them. Until then Play returns nothing and the app shows no tip anywhere, which is the intended fallback. Then tip once from the internal build as a licence tester, and re-submit the IARC questionnaire and Data safety per play-app-content.md. The 1.10 notes are drafted in store-listing.md and move under the version heading on release-please’s PR.